LONDON — The Times of London quoted a surveyor Friday as saying that almost the entire outside of Westminster Abbey is being refaced with new stone because of air pollution damage.
Peter Foster was quoted as saying the task of replacing the eroded stone with harder-wearing material will cost $13 million by the time it is completed in the early 1990s.
