A metal recycler must halt all discharges of a soupy waste that has over 30 years created a 40-foot slag heap on its beachfront property.
The Los Angeles Regional Water Quality Control Board on Thursday gave Halaco Engineering Inc. nine months to convert to a system that would remove water from the slurry generated by its smelting plant.
